Ct Cabinet And Meter Wiring Diagram – Are you an electrician working in our service area? Use this section of our site to find resources on our new service requirements, under-the-meter heat, temporary site electricity, metering and more. Do you have more questions? Call us at 800.748.5533.

This section is subject to revision. Roughrider Electric Cooperative is not responsible for any defective wiring on the secondary side of the electrical service.

Ct Cabinet And Meter Wiring Diagram

Ct Cabinet And Meter Wiring Diagram

Yes, but only on units up to 300 KVA. Nothing bigger will be provided. Concrete foundation diagrams are available in the Diagrams section below.

Wire Delta Meter Question.

No. However, we will provide the impedance so that the calculations can be made. Impedance numbers are printed on the outside of the transformer or can be obtained by calling our office.

What is the procedure to get Roughrider to visit the site to turn on the transformer, turn off the service, or something?

Such a visit requires us to schedule a site visit team. Please contact us to schedule a visit. Planning is usually a week. Plan accordingly.

Electricians will install their own stand (not shared) and run their own wiring for the stand.

Electric Meter Socket

Roughrider will install all overhead loops, risers and temporary meter sockets. Electricians should not attempt to install it themselves.

Is it ok to use permanent mains transformer and primary cable for temporary supply on site if they are already installed and laid? Can an electrician install an additional 2” lead with secondary pipes, then pull the wire and install a single phase 200 amp meter?

During construction, we will hang a meter loop. After the outlet is connected, electricians must provide a wiring certificate and notice that the service is ready for metering and power.

Ct Cabinet And Meter Wiring Diagram

Metered CT: Electricians provide meter socket, CT housing and secondary wiring between meter and transformer as per our specifications. See our list of part numbers below. Electricians install the CT enclosure and run a line between the secondary side of the transformer and the CT meter enclosure. CT meters should be located within 10 feet of the transformer. Roughrider will connect the CT housing and place the CT in the housing. The CT cabinet (CT housing) must be a separate unit from the meter socket that is placed next to the CT cabinet. Dual unit counter and CT retention units will not be allowed.

Current Transformer Metering

No. All we need is for the enclosure to be large enough to handle the amperage of your service.

As soon as the CT cabinet (if required) and meter socket are installed and the wiring certificate is obtained, Roughrider will connect the meter. We do our best to install the meter within a week after receiving the wiring certificate.

If you have electric heating as your primary heat source, you are entitled to a credit that applies from October to April.

Check the switches on all heat or submeters to make sure the meters are working. The counter display should not be blank. If your breakers are on and there is no meter display, please contact us at 800-748-5533.

Additive Injection System Configurations

It is the member’s responsibility to ensure that the heat meter is open and functioning properly. Roughrider Electric does not issue heating credits for kWh that are not registered in the heat energy subnumber. Do you like this book? You can publish your book online for free in minutes! Make your own flipbook

Description: Measurement Rev-9 Jan 2013 Page 1 of 84 8. MEASUREMENT 8.1 MEASUREMENT LOCATIONS 8.1.1 General requirements The customer will provide the company free of charge and …

CAN BE INSTALLED WITH ELECTRICAL PANEL OR ANYTHING SHOWN WITH CURRENT TRANSFORMER MEASUREMENT INSTALLATION. EACH SIDE CT CABIN. METER CENTER 2 PHASE 12O/240 VOLTS 5 WIRE PECO WILL GIVE METERS BETWEEN 3′ & 5′ FROM THE FLOOR. PLATE AND K.T. OPTION 1 1/2” OPTION #1 SOLID METAL #2 BRAD WHITE DOT IS ON LINE SIDE Q.T. (H1) MINIMUM SIZE 32”x24”x10” ATTACHMENT C.T. ON CABINET WITH UNIT AND TRANSPORT PE. ONLY ONE BOLT ATTACHES ON NUTS OR SECONDARY MAIN (SUPPLIED) CTs. Measuring Rev-9 CT (MULTI SCREWS MAY BE INCLUDED) January 2013 FOR MULTIPLE CABLE USE Page 51 of 84 NEUTRAL MULTI-CONDUCTOR CONNECTORS JUNCTION CABINET Figure 8.15. SIZE OF METERS. METERELECTRIC CENTER FOR INSTALLATION OF EVERYTHING SHOWN. TO BE ABOVE THE GROUND BETWEEN 3′ & 5′. QUAPECO NUMBER ABOVE 54, PLATE AND 1 1/2″ CT RIGID METAL LENGTH WILL NOT POWER #C’. 2 SPRING NUT 120V C T A0. MINIMUM SIZE CABINET TO MAKE ON ONE EMBROIDERED CONNECTION. ONLY 20 30 H 2″ ”D) QTY. (MAY CONTAIN MULTI-BOLT) MULTI-CONNECT REFERENCE TO YOUR REFERENCE FROM YOUR STATION, MAY ENTER FROM VIEW OR ADD Figure 8.16 Measurement Cycle-January 9, 2013 January 9, 2013 January 9, 2013 January 30, 2013 2013 COM 4 240V 4 WIRE DELTA SPEED CM (INTERNAL MOTOR 6) KVA METER.METER ELECTRICAL INSTALLATION CENTER ALL SHOWN.TO BE ON GROUND BETWEEN 3′ & 5′.ONE METER AT 62KWAPECO/NETWORK 1”2”1” CARBIDE #1 NIPPLEATTACH C.T. IS IN SERVICE SPRINGS C.T. (H1) BY WHITE DOT, UNIT AND 2. 120V C T A0 FROM PECO TRANS .120V SECONDARY SECTOR TO SECTOR (BUYER PROVIDED) C LEG FROM SECONDARY 8 TO 2. NO BURNER AND WILL BE IN LOWER LOCATION JUNCTION CABINET TO USE MULTIPLE CABLES CONNECTORS FOR VI MINIMUM WIRING CABINET SIZE (32”H x 32”H x 10”D) (DRAWINGS FOR REFERENCE ONLY) INPUT CABLE DRAWING D. SIDE, REAR OR BOTTOM Figure 8.18 Measurement Rev-9 January 2013 Page 54 / 84 Measurement Rev-9 January 2013 Page 55 / 84 Measurement Rev. CARD CAN BE INSTALLED ON TOP OR #1 OF ANY SIDE. CABINET. METERPECO CENTER METER, P.T.’S & CT’S WILL BE BETWEEN 3′ AND 5′ FLOORS. THE ELECTRICITY IS CONNECTED TO A PROFESSIONAL C.T. LINE WITH SOLID METALLIC ELECTRIC WIRE #8 600 VOLTS COVERED COPPER WIRE TO INSTALL EVERYTHING SHOWN BY P.T. 1 1/2” HIGH INCLUDING LOCK 4” MIN. 120V 120V 120V / OPTION #2 Ks2 Ks1 Ks2 Ks1 Ks2 Ks1 CONNECT P.T.’S & C.T.S TO UNISTRUT & SPRINGS PISTON PT PT PT CABINET. H2 H1 H2 H1 H2 H1 FOR USE 288V 288V 288V CENTRAL A0 / B0 C0 / ONLY ONE SCREW CONNECTION WHITE DOT LINE 277 VOLT /. CT A0 WILL BE MADE FOR CT. PAGE C.T. (H1) 277 VOLTS. CT B0 (INCLUDING MULTI-SCOLTE) 277 VOLT // .C T C0 FOR USING MULTIPLE CABLES FROM PECO NEUTRAL MULTI-WIRE CONNECTORS. ORSECONDARIMAINS CONNECT CA BINET. . MINIMUM CABINET SIZE (54”W x 42”H x 12”D) (DRAWINGS FOR REFERENCE ONLY) PIPE NOT DRAWN TO SCALE PIPE MAY ENTER SIDE, BACK OR BOTTOM OF CABINET Figure 8.21 Measurement Rev.131-1P2 January. / 84 277 / 480 VOLT SERVICE TRANSFORMER C.T. CABINET SECONDARY TYPE ROD TYPE 4” MIN. A0 B0 C0PADMOUNT TRANS. 120V 120V 120V MIN. 2” Ks1 Ks3 TRANSFORMERS Ks2 Ks1 Ks2 Ks1 Ks2 Ks1 CT PT Ks1 Ks3 C0 PT PT PT H2 H1 H2 H1 H2 H1 288V 288V 288V A0 288VPT Ks0 Ks2 H1 H2CT E Ks0 Ks2 H1 HCT E Ks. ‘S CT BONDPT T C0 B0 UNISTRUT WITH CT ON CABINET 120V SPRING NUTS. R NEUTRAL C0 A 288V KAURA NEUTRAL L H1 H2MOUNT P.T. LOCATED ON THE SPRING UNIT ON THE PTTRANS. ONLY ONE BOLT CONNECTION WILL BE MADE ON THE SIDE WALLS 2” REAR OPENING Ks1 Ks2 120V 288V H1 H2 PT Ks1 Ks2 120V OPTIONAL WINDOW TYPE C.T. ONE CABLE USES MULTIPLE CONDUCTOR CONNECTORS FOR MORE THAN SECONDARY LEAD ON TRANSFORMER C.T. (MAY CONTAIN MULTIPLE LOCKS). WIRING WILL BE DONE WITH CONTRACTOR’S PRIMARY POTENTIAL TRANSFORMER #8 600V COPPER CLAD WIRE WHICH WOULD BE ELECTRIFIED PER LINE C.T. METERS FOR CABLE TERMINATION BEFORE WORK. ( H1) DO NOT REMOVE SHUNTS FROM C.T.

Ct Cabinet And Meter Wiring Diagram

Hour meter wiring diagram, electric meter wiring diagram, ct cabinet wiring diagram, ct kwh meter wiring diagram, rpm meter wiring diagram, meter box wiring diagram, amp meter wiring diagram, electric meter box wiring diagram, ct meter wiring diagram, auto meter wiring diagram, 3 phase meter wiring diagram, ct meter connection diagram